The rebuild of the landscape area was completed during years 2018-2021. The “backbone” of the park is a big stream, which could be crossed by four new footbridges for pedestrians and cyclists – two made of monolithic concrete, two concrete footbridges with a wooden bridge deck. The water surface could be reached by a so-called water steps. The pathway network and lighting are completely new. The construction also involves three new playgrounds and a fitness trail. Furthermore, in the southern part of the area, a new so-called “Treetop Walkway” was placed, which offers exercising in the rope barriers. It is a suspended pathway which is placed on trees between two wooden towers. The final phase of the construction is the implementation of littoral vegetation on the banks of a small river.